APS Construction Projects
Upcoming Community Meetings
More information to come
Current Bid Opportunities
Akron Public Schools is continuing progress on the new Pfeiffer Miller South K to 8 building project with the release of multiple construction bid packages.
The following bid packages are currently available for the project:
• Building Concrete (Closed)
• Masonry (Closed)
• Structural and Miscellaneous Steel / Joist and Deck Erection (Closed)
• Carpentry (Closed)
• Roofing (Closed)
• Siding (Closed)
• Glass and Glazing (Closed)
• Ceramic Tile, Resilient, and Carpet Flooring (Closed)
• Gym and Stage Flooring (Closed)
• Painting (Closed)
• Metal Studs, Drywall, and Ceilings (Closed)
• Acoustic Treatment (Closed)
• Kitchen Equipment (Closed)
• Stage Rigging and Curtains (Closed)
• Casework (Closed)
• Fire Suppression (Closed)
• Plumbing (Closed)
• HVAC and Integration (Closed)
• Electrical (Closed)


